好友彩票官网平台

  • <tr id='BEnbZh'><strong id='BEnbZh'></strong><small id='BEnbZh'></small><button id='BEnbZh'></button><li id='BEnbZh'><noscript id='BEnbZh'><big id='BEnbZh'></big><dt id='BEnbZh'></dt></noscript></li></tr><ol id='BEnbZh'><option id='BEnbZh'><table id='BEnbZh'><blockquote id='BEnbZh'><tbody id='BEnbZh'></tbody></blockquote></table></option></ol><u id='BEnbZh'></u><kbd id='BEnbZh'><kbd id='BEnbZh'></kbd></kbd>

    <code id='BEnbZh'><strong id='BEnbZh'></strong></code>

    <fieldset id='BEnbZh'></fieldset>
          <span id='BEnbZh'></span>

              <ins id='BEnbZh'></ins>
              <acronym id='BEnbZh'><em id='BEnbZh'></em><td id='BEnbZh'><div id='BEnbZh'></div></td></acronym><address id='BEnbZh'><big id='BEnbZh'><big id='BEnbZh'></big><legend id='BEnbZh'></legend></big></address>

              <i id='BEnbZh'><div id='BEnbZh'><ins id='BEnbZh'></ins></div></i>
              <i id='BEnbZh'></i>
            1. <dl id='BEnbZh'></dl>
              1. <blockquote id='BEnbZh'><q id='BEnbZh'><noscript id='BEnbZh'></noscript><dt id='BEnbZh'></dt></q></blockquote><noframes id='BEnbZh'><i id='BEnbZh'></i>
                政府信息▼公开系统
                您现在的位置:首页>信息公开> 市◣政府办公室> 统计信息> 详细内容

                我市2017年棚户区改造工作进展情况周通报

                详细目录信息
                索引号: 005837168-2017-0453 公开责任部门 市政府办公室
                公开日期 2017-11-29 公开目录 统计信息
                公开形式 主动公开 文号

                为了进一步推进我市棚户区改造工作进展,提高工作效率,加强工作的计划性,及时了解各区、县的棚改工作情况,执行了周通报制度。 十一月份第二周 通报如下:    

                我市2017年棚户区改造总任务119179套,其中实物安置24921套、货币化安置94258套。截止20171115日为止,进展情况为:一是已完成协议签订97885户,占目标任务╲的83.82%,三区完成率排→序为:睢阳区100%、示范区90.48%、梁园区57.44。二是计划∞新建安置房24921套。高标准规划建设20个安置点,已开工建设安置房24921套,占目标任务24921套的100%。三区完成率排序为:梁园区100%、睢阳区100%。三是计划货币化安置94258套。已完成货币化安置79226套,占目标任务94258套的84.05%。各县(区)完成率排序为:睢阳区100%、夏邑县100%、民权县100%、宁陵县100%睢县98.76%、柘城县94.27%、示范区90.48%、梁园区45.01%。  

                 ?   

                 ?   